Skip to main content
Congratulation to Ben Harris for the sale of Lakewood Industrial Park.
The Lakewood Industrial Park Portfolio offers a unique portfolio acquisition and development opportunity in Greenville, South Carolina. The site is ideally located off Butler Road with close proximity to I-85, I-385, and I-185, all within a 5-minute drive time. The 14 buildings in this portfolio range from 2,400 to 10,000 square feet, and Greenville’s desirable industrial market has experienced 11.6% rent growth in the past 12 months for comparable products. The portfolio is comprised of two general locations, being Lakewood Industrial Park in Mauldin, SC and the Donaldson Center in Greenville SC. Lakewood Industrial Park is located at 271 West Butler Road, and is comprised of 11 freestanding industrial and flex buildings totaling approximately 42,400 SF, spread across 7.5 acres. Six of these buildings are 2,400 SF, located on the northern side of the park, and the remaining five are a mixture of two 5,500 SF and three 6,000 SF pre-engineered metal buildings.